Decided to finally make something sweet for after diner, and it was real easy to make - just a little time consuming.
Spice Orange Cake w/ Caramel Glaze (or Dulce de Leche)
For the cake:
All I did was add 1 tsp. Japanese Five Spice to a Duncan Hines orange cake mix and followed the directions on the cake mix box. For this recipe, I used a Bundt(r) pan.
For the Caramel Glaze:
Take one 12oz can sweetened condensed milk, and remove the top. Place in small sauce pan; fill with water to about 3/4 way up the can; bring water to boil and let milk sit, stirring occasionally. Maintain doing this until milk turns caramel in color and thickens. This can take upwards of 1 hour.
** Caution** make sure there is water in the pan at all times. And, make sure NO water gets into the milk.
Cake should be done way before the sauce is. So, when you are ready just drizzle the sauce on the cake, and serve. You can heat up the sauce in a separate bowl to keep it fluid and warm. YUM!!
**Note**
This is how Dulce de Leche is made.
Just to keep those that are interested in what we are doing, and where we are going since moving to Aberdeen, Mississippi.
Thursday, November 11, 2010
Sunday, November 7, 2010
Gas Radiator - Resonator
This beautiful thing is called a resonator - a gas radiator, I guess. I'd love to know if anyone can help me find out what this really is called. The inserts are ceramic on most of them. I happen to have a few of these here in our home, and I will take pictures of those to share later.
Well, we are hitting below the freezing point here in Aberdeen, and I am still without heat. We are now going on week 5, and now have to wait until 2 more weeks because the money I had saved up to get the guy out here to pressure test our gas line, has yet to show up. Now, please keep in mind that I have called other plumbers to do this, but I am still waiting for Santa to bring me my Rolls Royce Silver Phantom.
Major flaw here is that it takes too long for someone to get a hold of you. Bad business, people, bad business.
Well, we are hitting below the freezing point here in Aberdeen, and I am still without heat. We are now going on week 5, and now have to wait until 2 more weeks because the money I had saved up to get the guy out here to pressure test our gas line, has yet to show up. Now, please keep in mind that I have called other plumbers to do this, but I am still waiting for Santa to bring me my Rolls Royce Silver Phantom.
Major flaw here is that it takes too long for someone to get a hold of you. Bad business, people, bad business.
Subscribe to:
Posts (Atom)